Single point of responsibility for every phase of the project

PESCO Contracting provides a single point of accountability and responsibility throughout every project. One team manages the entire scope of work, from detailed engineering, procurement, logistics and supply chain to installation, approvals, construction, testing and commissioning. This enables clients to coordinate with one contractor rather than manage handoffs between multiple parties.

What we do

PESCO Contracting's scope covers power, oil & gas, substation, and water infrastructure projects, delivered through one consistent, repeatable project methodology.

  • PESCO engineers reviewing a drawing in the workshop

    Design & Engineering

  • PESCO engineer inspecting a process skid on site

    Procurement

  • PESCO surveyors setting out with a total station

    Project Planning & Management

  • PESCO engineers reviewing drawings on a process platform

    Site Management

  • PESCO technician testing a control panel

    Pre-commissioning

  • A commissioned gas turbine package on site

    Commissioning

PESCO engineers reviewing a drawing in the workshop

Design & Engineering

PESCO engineer inspecting a process skid on site

Procurement

PESCO surveyors setting out with a total station

Project Planning & Management

PESCO engineers reviewing drawings on a process platform

Site Management

PESCO technician testing a control panel

Pre-commissioning

A commissioned gas turbine package on site

Commissioning

Industries served

Projects Delivered by Pesco Contracting

Power generation, transmission & distribution · Oil & gas facilities · Industrial & process plants · Government & utility infrastructure

View all
Oil and Gas

LDO & LCO : Low density oil system

Water

Raw water storage tank

Water

SWRO Emergency Water

Pipeline

Water Pipeline Project

Storage

Fuel Storage

Storage

Diesel Storage

storage

Turnkey HFO topping plant with API Tank & 2KM Crude Pipeline.

Power

2x9E (240MW)

Power

3 X 25 MW Gas Fire Power Plant

Power

GE TM2500

Power

70MW Power Plant

Shutdown

Habshan

Shutdown

Asab 3 utility

Sub Station

65+ sub stations across Abu Dhabi

Certifications

Certified to the highest global standards.

ISO 9001, ISO 14001, and ISO 45001 certification cover quality, environmental, and safety management. ASME-certified fabrication backs every tank, skid, and pressure vessel we build. ICV certification and approved-vendor status with ADNOC, TAQA, and ENEC confirm we're eligible to bid on the region's most demanding contracts.

  • Approved Vendor
  • Approved Vendor
  • Approved Vendor
  • Certified Fabrication
  • Certified
  • Quality Management
  • Environmental
  • Occupational Health & Safety

Why PESCO

Why Customer Trust PESCO?

  • Single point of accountability

    Engineering, fabrication, installation and commissioning all sit under one contract with PESCO Contracting, so when something needs resolving mid-project, there's one company to call.

  • In-house fabrication backing

    PESCO Contracting draws on a state-of-the-art, ASME Nuclear-certified fabrication facility in Abu Dhabi, the first of its kind in the UAE, which means tanks, skids and pressure equipment for a project are built on PESCO's own schedule.

  • Built for the hardest timelines and conditions

    The 264MW power plant was engineered and constructed under active conflict conditions and still reached commissioning. The clearest evidence PESCO has that a compressed timeline or a difficult site isn't a reason to renegotiate scope.

  • Local, approved and accountable

    PESCO Contracting is ADNOC, TAQA and ENEC-approved, and ICV-certified. These credentials matter directly to procurement teams evaluating vendor eligibility. A 100% Abu Dhabi-based operation.

Single point of accountability

Engineering, fabrication, installation and commissioning all sit under one contract with PESCO Contracting, so when something needs resolving mid-project, there's one company to call.

In-house fabrication backing

PESCO Contracting draws on a state-of-the-art, ASME Nuclear-certified fabrication facility in Abu Dhabi, the first of its kind in the UAE, which means tanks, skids and pressure equipment for a project are built on PESCO's own schedule.

Built for the hardest timelines and conditions

The 264MW power plant was engineered and constructed under active conflict conditions and still reached commissioning. The clearest evidence PESCO has that a compressed timeline or a difficult site isn't a reason to renegotiate scope.

Local, approved and accountable

PESCO Contracting is ADNOC, TAQA and ENEC-approved, and ICV-certified. These credentials matter directly to procurement teams evaluating vendor eligibility. A 100% Abu Dhabi-based operation.

Trusted by

The clients PESCO Contracting has already earned